integration:dhis2_integration

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
integration:dhis2_integration [2026/02/16 09:39] – [mSupply preferences] Gary Willettsintegration:dhis2_integration [2026/02/16 14:43] (current) – [DHIS2 data] Gary Willetts
Line 21: Line 21:
   - The amount of stock issued   - The amount of stock issued
   - The amount of stock expiring within 90 days   - The amount of stock expiring within 90 days
 +  - The amount of stock expiring within 180 days
   - The amount of stock expired   - The amount of stock expired
   - Average monthly consumption   - Average monthly consumption
Line 67: Line 68:
     * **Custom field name column:** Required if **Different data elements per item** is selected in the //Setup// section. Enter the corresponding item custom field name used to identify the item corresponding DHIS2 data element code.     * **Custom field name column:** Required if **Different data elements per item** is selected in the //Setup// section. Enter the corresponding item custom field name used to identify the item corresponding DHIS2 data element code.
     * **Interval column:** Select the interval between successive sends of the data element. Select one of //monthly//, //weekly//, //daily//, //first day of the month// and //last day of the month// by clicking on the down arrow in the cell and selecting the appropriate option.     * **Interval column:** Select the interval between successive sends of the data element. Select one of //monthly//, //weekly//, //daily//, //first day of the month// and //last day of the month// by clicking on the down arrow in the cell and selecting the appropriate option.
-    * **Push data basis column:** Select the basis of the data to be sent, one of //previous month// or //current day//. Again, click on the down arrow in the cell and click on the appropriate option to select it.+    * **Push data basis column:** Select whether the data is calculated for the current day or the previous month. Again, click on the down arrow in the cell and click on the appropriate option to select it.
     * **Prefix column:** If the data element ID needs to have a prefix added to it before it is sent to DHIS2 then enter that in this column.     * **Prefix column:** If the data element ID needs to have a prefix added to it before it is sent to DHIS2 then enter that in this column.
 +    * **Last pushed date column:** The date the element was last sent to DHIS2.
 +    * **Parameters:** Enter any parameters that need to go with the data element. Click into the appropriate cell and type to edit.
   * **Data set ID:** Enter the ID of the dataset in DHIS2 that you want to push the data to.   * **Data set ID:** Enter the ID of the dataset in DHIS2 that you want to push the data to.
   * **Period format:** Enter the format to send the period information to DHIS2. Something like "YYYYMM", where YYYY represents the year, MM represents the month and DD represents the day.   * **Period format:** Enter the format to send the period information to DHIS2. Something like "YYYYMM", where YYYY represents the year, MM represents the month and DD represents the day.
  • Last modified: 2026/02/16 09:39
  • by Gary Willetts